Our Process · Step 04
Keeping the build faithful to the design.
A design is only as good as its installation. We stay engaged through construction — providing drawings to the general contractor, answering field questions, and catching deviations before they become expensive problems.
Installation and conduit drawings for the contracting team
A site visit may be required for oversight and verification field decisions
Deviations are incorporated into the model to determine if the deviation has degraded performance and requires correction or if it should be incorporated into the as-built design documentation
Do you need an ERCES or Cellular DAS installer in the DFW area?
Installer recommendationSmall deviations — an extra bend, a relocated antenna, an improperly seated connector — quietly degrade performance and surface later as failed grid tests. Oversight during installation is far cheaper than rework after verification.
Tell us about your building and coverage requirements — we'll help you determine what's needed and walk you through exactly how we'd approach it.