RHO Wireless will
install your wireless network, test and verify its operation.
The installation will be documented for future reference. The
first step of the installation is the site survey.
Site Survey
A wireless site survey is a physical survey of
the premises to verify the best possible locations to install
access points and bridges to ensure 100% wireless
coverage. When considering the use of wireless equipment, it
is extremely difficult to predict the propagation of radio
waves and detect the presence of interfering signals. Walls,
doors, elevator shafts, trees, and other obstacles offer
varying degrees of attenuation, which cause the radio
frequency (RF) radiation pattern to be irregular and
unpredictable. As a result, a wireless site survey
is performed to understand the behavior of radio waves at
the installation site. The goal of the site survey is to
gather enough information and data to verify the number and
placement of access points and bridges that will provide the
coverage required. Coverage required usually means the support
of a minimum data rate in a given area. A site Survey will
also detect the presence of radio interference coming from
other sources that could degrade the performance of the
wireless LAN. The need and complexity of a site survey will
vary depending on the size and make-up of the
installation site. RHO Wireless will perform a
preliminary site survey to aide in the development of a
customer's estimate or quotation.
Installation
The installation phase is the most physically
demanding phase of the project and includes a more rigorous
site survey to ensure that the selected Wireless LAN hardware
will provide the desired coverage and bandwidth to the
Wireless LAN users. The installation is normally a smooth
process. The access points, antennas, and/or bridges are
installed at the installation site using the marked up drawing
produced during the preliminary site survey and verified
during the survey at the beginning of the installation phase.
- Activities that will take place during the
installation include:
- Preliminary configuration of access points,
bridges, routers and switches
- Connection of the router and/or switches to
the broadband backbone (DSL, Cable, T-1, T-3, or DCS-3), and
verification of operation
- Preliminary mounting and connection of
access points, antennas and/or bridges for the site
survey
- Site Survey - Verification of
coverage and access point/bridge
placement
- Final mounting and connection of
access points, antennas and/or bridges for the site
survey
- Mounting of power injectors, if
required
- Final configuration of access points and
hardware
- Wireless LAN operational demonstration and
verification with the customer
After completing the installation, testing for
proper operation and coverage in all frequency bands (for
example: 802.11b, 802.11g, and/or 802.11a,). Finally,
documentation, warranty information, and Wireless
LAN operation settings and passwords for the installed
system hardware and software will be provided.
Estimate
Contact
Us for a preliminary site survay and
estimate: